estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Parameter Maximum Likelihood Estimations from Incomplete Data in Generalized Linear Models
不完全数据广义线性模型参数的极大似然估计 - Research on Multi-Channel SAR Ground Moving Target Detection and Parameter Estimations
多通道SAR地面运动目标检测与参数估计研究 - Annotate the problem query with relevant statistics to better understand what the DB2 optimizer is using for its estimations.
使用相关统计数据来注释有问题的查询,这样可以更好地理解DB2使用哪些内容来进行评估。 - Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
基于MCMC的多维相关系数平稳序列 - Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
关于线性模型中误差方差估计的收敛速度的若干注记 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。 - The consistency and asymptotic normality of the estimations have been proved. Moreover, statistic on testing equality of two exponential distributions and its limit distribution are given.
证明了估计的强相合性以及渐近正态性,给出了检验两总体参数相等的检验统计量及检验统计量的极限分布。 - The rotor angular velocity is calculated with the observed estimations, including the rotor angular velocity, to realize the speed sensorlesss control.
并用含转子角转速的观测估计值算出转子角转速,实现了无速度传感器控制。 - In particular, the team can estimate the three values lowest, nominal, and highest estimations assuming that the risk was removed, and then apply these values to reestimate the project variance.
特别地,团队可以估计三个值最低、标准和最高估计值交涉去掉了风险,并且应用这些值重新估计项目方差。 - No plans, no estimations, no iterations, no overhead – There is no silver bullet and no alternative to hard work, discipline, target on perfection and constant improvements.
没有计划、没有估算、没有迭代、没有管理开销&从来不存在银弹,而且除了努力工作、纪律、追求完美和持续改进之外,别无他法。
