词语站>英语词典>backlog翻译和用法

backlog

英 [ˈbæklɒɡ]

美 [ˈbæklɔːɡ]

n.  积压的工作
vt.  (使)积压; 储存

复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs 

BEC计算机

Collins.1 / BNC.14585 / COCA.14476

牛津词典

    noun

    • 积压的工作
      a quantity of work that should have been done already, but has not yet been done

      柯林斯词典

      • N-COUNT 积压的事情;未完成的工作
        Abacklogis a number of things which have not yet been done but which need to be done.
        1. There is a backlog of repairs and maintenance in schools.
          对各学校的修缮和维护工作积压了一堆。

      英英释义

      noun

      • an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
        1. something kept back or saved for future use or a special purpose
            Synonym:reservestockpile
          1. the large log at the back of a hearth fire

            verb

            • accumulate and create a backlog

              双语例句

              • Primarily, a small requirements backlog greatly enhances your responsiveness to customers.
                首先,一个小规模需求积压能大大增强您对客户的响应能力。
              • In Scrum, velocity is how much product backlog effort a team can handle in one sprint.
                在Scrum中,速率是一个团队在一个sprint中可以处理的产品backlog的工作量。
              • There is a backlog of repairs and maintenance in schools.
                对各学校的修缮和维护工作积压了一堆。
              • But if the suppliers own products backlog, and will take the same way in online auctions.
                而且如果供货商自己的产品积压,也会采取同样的方式在网上拍卖。
              • One of the most important artifacts in the Scrum method is the Product Backlog.
                Scrum方法中一种最重要的产品,就是ProductBacklog。
              • This backlog has been worked through the system and suppliers in this sector are anticipating a difficult time ahead.
                这些积压的订单已经完成,这个行业的系统和供应商预计未来将是一段艰难的日子。
              • Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
                这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。
              • The product backlog supersedes traditional requirements artifacts, such as market and product requirements specifications.
                产品待办事项列表代替了传统的需求文档,比如市场和产品的需求规格说明书。
              • The product backlog items are estimated.
                产品待办事项列表中的待办项都是被估算过的。
              • This enables them to spot possible improvements and inconsistencies in the features on the product backlog.
                这可以让他们发现产品Backlog中特性里的潜在改进和不一致。