backlog
英 [ˈbæklɒɡ]
美 [ˈbæklɔːɡ]
n. 积压的工作
vt. (使)积压; 储存
复数:backlogs 过去分词:backlogged 现在分词:backlogging 过去式:backlogged 第三人称单数:backlogs
Collins.1 / BNC.14585 / COCA.14476
牛津词典
noun
- 积压的工作
a quantity of work that should have been done already, but has not yet been done
柯林斯词典
- N-COUNT 积压的事情;未完成的工作
Abacklogis a number of things which have not yet been done but which need to be done.- There is a backlog of repairs and maintenance in schools.
对各学校的修缮和维护工作积压了一堆。
- There is a backlog of repairs and maintenance in schools.
英英释义
noun
- an accumulation of jobs not done or materials not processed that are yet to be dealt with (especially unfilled customer orders for products or services)
- something kept back or saved for future use or a special purpose
- the large log at the back of a hearth fire
verb
- accumulate and create a backlog
双语例句
- When I returned from maternity leave, there was a backlog of work waiting for me.
是积压的邮件。我休产假回来上班后,有一大堆工作等着我做,可以说。 - There is a backlog of repair and maintenance work to be done in our apartment.
我们的公寓堆积了一些待修理及维修的事项。 - In Scrum, velocity is how much product backlog effort a team can handle in one sprint.
在Scrum中,速率是一个团队在一个sprint中可以处理的产品backlog的工作量。 - One of the most important artifacts in the Scrum method is the Product Backlog.
Scrum方法中一种最重要的产品,就是ProductBacklog。 - There is a backlog of repairs and maintenance in schools.
对各学校的修缮和维护工作积压了一堆。 - Such changes and any missing or incorrect functionality were added to the product backlog for the next sprint.
这些修改和任何缺失的或错误的功能都添加到下一次sprint的产品待办事项中。 - But if the suppliers own products backlog, and will take the same way in online auctions.
而且如果供货商自己的产品积压,也会采取同样的方式在网上拍卖。 - This backlog has been worked through the system and suppliers in this sector are anticipating a difficult time ahead.
这些积压的订单已经完成,这个行业的系统和供应商预计未来将是一段艰难的日子。 - The team can also use this new knowledge to change estimates of existing stories in the backlog.
团队还可以使用这些新知识对计划安排中的现有描述进行重新评估。 - Some teams estimate the size of all of the items in their backlog prior to any development.
有些团队在任何开发之前都要对他们积压中所有条目的大小进行评估。